Current/In-Progress
- Campus-Wide Lighting Upgrade Project
- Electric Vehicle Charge Stations
- Entrance Marquee Project
- Fire Alarm Controller Upgrades
- Library Renovations Project
- Live Oak Terrace Shade Structure Project
- PAC Storage and Interior Defects
- PE 200 Gas Generator Project
- Satellite Coffee Structures at IVC and ATEP and Cafeteria Upgrades at IVC
- Scheduled Maintenance Roofing and HVAC Project (PE 100, PE 200, A100, A200 and A300)
On Going
- Campus-Wide Infrastructure Projects Plan
- Scheduled Maintenance Campus-Wide Floors and Finishes Project
- Scheduled Maintenance Campus-Wide Painting Project
Scheduled
- Scheduled Maintenance Campus-Wide Electrical Upgrades Project
- Scheduled Maintenance Campus-Wide Plumbing Project
- Student Services Center
- Student Union
Completed
- Access Control Project
- Arts Village
- B Quad: ADA Transition Plan
- B100 Scheduled Maintenance Roofing and HVAC Replacement Project
- B 200 Chemistry Labs Renovation
- B 200 Furniture, Fixtures, Equipment (FFE) and Finishes Renovations Project
- English Language Center (A 200 Success Center)
- Live Oak Terrace Sound and Stage Upgrades
- Lot 6: Solar Shade
- Outdoor Learning Labs
- PE 200 Gym Bleachers Replacement Project
- Soccer, Baseball and Practice Fields