Capital Outlay

Access Control Project

Project Start Date: Spring 2019
Construction Start Date: Summer 2019
Project Completion Date: September 2021
Project Description:
The Access Control Project is a campus-wide security upgrade project. Its components, installed in two phases, include: Cameras and requisite software/servers/switches, Panic buttons, Keyless entry card readers with electronic access hardware/cabling/ADA barrier revisions, and an Automated system for Campus Police Dispatch.

Design phase began the Spring of 2019 and installation Summer 2019. The project has a tentative construction completion date of September 2021.

Access Control Red

Access Control Panel Blue Green