Capital Outlay

PAC Storage and Interior Defects

Project Start Date: Fall 2020
Construction Start Date: September 2021
Project Completion Date: December 2021
Project Description:

The Scene and Prop Shop and Storage Area inside the Performing Arts Center (PAC) will receive some interior defect repairs. Following the completion of these repairs, a prefabricated metal storage building with 14 foot rollup doors and climate control system will be built on a concrete slab directly outside of the PAC.

Design phase began Fall of 2020 and the design was approved May 2021. The project is slated to begin construction September 2021 with completion in December 2021.

pac-storage.jpg