Project Start Date: Fall 2020
Construction Start Date: Spring/Summer 2022
Project Completion Date: October 2022
Project Description:
The Scene and Prop Shop and Storage Area inside the Performing Arts Center (PAC) will receive some interior defect repairs. Following the completion of these repairs, a prefabricated metal storage building with 14 foot rollup doors and climate control system will be built on a concrete slab directly outside of the PAC.
Design phase began Fall of 2020 and the design was approved May 2021. The project is slated to begin construction Spring/Summer 2022 with completion in October 2022.